Huawei FusionModule2000 Installation Manual page 51

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Table 4-1 Specifications of bases with adjustable dimensions
Type
300 mm wide base
600 mm wide base
800 mm wide base
Preparations
Tools: ruler, marker, torque wrench, Phillips screwdriver, right angle, hammer drill, φ16 drill
bit, level
Materials: base and accessories, expansion bolt, base connecting plate, washer, floor holder
Document: base installation position diagram
Procedure
Step 1 Adjust the base height.
1.
Issue 02 (2018-03-31)
Measure the distance (H) between the concrete floor and the upper surface of the ESD
floor using a ruler and record the value of H.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 (Optional) Installing Bases
Dimensions
Height (adjustable): 270–410 mm; depth
(adjustable): 1000 mm, 1100 mm, or 1200
mm
Height (adjustable): 410–700 mm; depth
(adjustable): 1000 mm, 1100 mm, or 1200
mm
Height (adjustable): 270–410 mm; depth
(adjustable): 1000 mm, 1100 mm, or 1200
mm
Height (adjustable): 410–700 mm; depth
(adjustable): 1000 mm, 1100 mm, or 1200
mm
Height (adjustable): 270–410 mm; depth
(adjustable): 1000 mm, 1100 mm, or 1200
mm
Height (adjustable): 410–700 mm; depth
(adjustable): 1000 mm, 1100 mm, or 1200
mm
42

Advertisement

Table of Contents
loading

Table of Contents