Cable Routes For The Dual-Row Aisle Containment Scenario (Smart Busway) - Huawei FusionModule2000 Installation Manual

Smart modular data center
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide
Figure 17-10 Routing power cables and signal cables
(1) Power cable
(4) Smart ETH gateway
17.5 Cable Routes for the Dual-Row Aisle Containment
Scenario (Smart Busway)
Issue 02 (2018-03-31)
(2) Signal cable
(5) Network cabinet
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
17 Connecting Cables
(3) Optical fiber
(6) PDC
275