Figure 7-6 Securing an adaptive frame
Step 4 Install the rear panel in the same way.
Step 5 Use four M4x10 screw assemblies to secure the top panel to the front and rear panels, as
shown by (1) in
Do not over-tighten the top panel of the adaptive frame. Otherwise, the top panel will be
uneven.