Figure 6-6 Removing M8 screws
Step 2 Open the cabinet rear door, install the horizontal ground bar on the topmost position of the
rack rail (outside), and secure the ground bar using the M8 screws removed earlier.
Figure 6-7 Installing a horizontal ground bar
----End

6.8 (Optional) Installing a Vertical Ground Bar

Context
Install the vertical ground bar in the IT cabinet that is closest to the PDC. The BOM number
of the vertical ground bar is 21241363.
Preparations
Tool: Phillips screwdriver
Material: vertical ground bar
Issue 02 (2018-03-31)
Install the horizontal ground bar in the battery cabinet or IT cabinet adjacent to the PDC.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6 Installing the Network Cabinet, IT Cabinet, and Battery
Cabinet