FusionModule2000 Smart Modular Data Center
Installation Guide
Figure 15-78 Laying out a water detection cable (bottom pipe routing)
(1) ECC800
Do not contact the water detection cable to metal, for this action will cause a false alarm. Take
protective measures when routing a water detection cable.
Issue 02 (2018-03-31)
(2) Network cable
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15 Installing Monitoring Devices
(3) Water detector
(4) Water detection cable
236