Connection To Qnascpu Or Anscpu - Mitsubishi Electric GT1685 Connection Manual

Got1000 series
Table of Contents

Advertisement

5.2.3

Connection to QnASCPU or AnSCPU

When one GOT is connected
Extension base
unit
Extension cable
Extension
Extension
Main
cable
base
base
*1
Main
-
-
base
5 - 14
5. BUS CONNECTION
5.2 System Configuration
Bus extension
Main base unit
connector box
Connection cable 1)
PLC
Bus
connector
Connection cable 1)
conversion
box
-
-
GT15-A1SC05NB(0.45m)
GT15-A1SC07NB(0.7m)
A7GT
GT15-A1SC30NB(3m)
-CNB
GT15-A1SC50NB(5m)
GOT
Connection cable 2)
Connection cable 2)
*2
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
-
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
-
GT15-C300EXSS-1(30m)
*3
GT15-C100EXSS-1(10m)
GT15-C200EXSS-1(20m)
GT15-C300EXSS-1(30m)
*3
Communication driver
Bus(A/QnA)
GOT
*4
Model
Option device
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
Between main base
GT15-ABUS2
and GOT: 5m
- (Built into GOT)
GT15-75ABUSL
GT15-75ABUS2L
GT15-ABUS
Between main base
GT15-ABUS2
and GOT: 30m
- (Built into GOT)
GT15-75ABUSL
Between main base
GT15-75ABUS2L
and GOT: 35m
GT15-ABUS
(Including between
GT15-ABUS2
main base and bus
connector conversion
box)
- (Built into GOT)
Between main base
and bus connector
conversion box: 5m
Max. distance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents