Mitsubishi Electric GT1685 Connection Manual page 166

Got1000 series
Table of Contents

Advertisement

1.
Set the station number switching device.
Select [Common]
station number switching device.
Do not use a device of PLC CPU as a screen switching device. Since the device information is transferred by the
tracking transfer function of the redundant system, the status observation may be disabled.
2.
Set the status observation.
Make the settings so that the station number is switched when the faulty station information (SW70) of
MELSECNET/H turns ON in the project specified by selecting [Common]
Condition 1 : SW70.b0 (while ON)
Operation
Condition 1 : SW70.b1 (while ON)
Operation
Create the status observation in the project on the Project tab.
POINT
POINT
POINT
Setting for the status observation function
For the status observation function, hexadecimals cannot be used.
To use the status observation function, set the N/W No. and the station No. of the PLC CPU in [Unsigned BIN].
(For the status observation function, set [Unsigned BIN] for [Storing Device])
Example:
When N/W No.: 1 and Station No.: 1 (0101H)
Set "257".
When N/W No.: 10 and Station No.: 10 (0A0AH)
Set "2570".
4 - 32
4. HOW TO MONITOR REDUNTANT SYSTEM
4.10 Switch the Monitor Target to the Control System Using the Script Function
[Controller Setting]
[Station No. Switching], and set the internal device GD100 as the
: GD100=2
: GD100=1
Set here.
[Status Observation].
When b0 is ON, Station No. 1 is abnormal.
Station No. is changed to 2.
When b1 is ON, Station No. 2 is abnormal.
Station No. is changed to 1.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents