Mitsubishi Electric GT1685 Connection Manual page 484

Got1000 series
Table of Contents

Advertisement

POINT
POINT
POINT
When changing the sequence program
After writing the sequence program to the PLC CPU, operate the PLC CPU ether turning OFF and then ON or resetting.
13 - 44
13. CC-Link CONNECTION (INTELLIGENT DEVICE STATION)
13.4 PLC Side Setting
Head No. of RX (RX0)
RX refresh destination (X)
RX refresh destination
device head No. (400)
No. of refresh points (32)
RY head number (RY0)
RY refresh destination (Y)
RY refresh destination
device head No. (400)
No. of refresh points (32)
RW head No. (RW0)
RW refresh destination (D)
RW refresh destination
device head No. (200)
No. of refresh points (260)
SB head No. (SB0)
SB refresh destination (B)
SB refresh destination
device head number (0)
No. of refresh points (512)
SW head number (SW0)
SW refresh destination (W)
SW refresh destination
device head No. (0)
No. of refresh points (512)
Dedicated instruction
(RRPA)
CC-Link module head
I/O No. (0000
)
H
Parameter storage head
device (D100)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents