Mitsubishi Electric GT1685 Connection Manual page 194

Got1000 series
Table of Contents

Advertisement

When three GOTs are connected
Extension base
unit
Extension cable
Extension
Extension
Main base
*1
base
cable
-
-
Main base
Extension
Extension
Main base
base
cable
*1
For the extension cables, refer to MELSEC-A/QnA catalog (L(NA)08024).
*2
The connection of multiple GOTs
When connecting to multiple GOTs with GT 16, GT15 and GT11 mixed, use GT11 as a terminal.
*3
The number of connectable GOTs is restricted according to the CPU type and the number of intelligent function modules.
5 - 18
5. BUS CONNECTION
5.2 System Configuration
Main base unit
Connection cable 2)
*3
PLC
Connection cable 1)
-
-
5.4.12 When connecting multiple GOTs
1st GOT
2nd GOT
Connection cable 3)
Connection cable 2)
Bus connector
conversion box
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
-
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
GT15-A1SC07B(0.7m)
GT15-A1SC12B(1.2m)
-
GT15-A1SC30B(3m)
GT15-A1SC50B(5m)
3rd GOT
Connection cable 4)
*2
GOT (1st)
Option device
Model
*5*6
GT15-75ABUS2L
GT15-ABUS2
GT15-75ABUS2L
GT15-ABUS2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents