Mitsubishi Electric GT1685 Connection Manual page 435

Got1000 series
Table of Contents

Advertisement

(c) Routing setting
Up to 238 [Target Station Network No.]s can be set.
However, the same target station network number
cannot be set twice or more (multiple times).
Therefore, the one that can access to other station
from the request source host GOT is 238 kinds of
[Target Station Network No.]s.
Item
Target Station Network No.
Relay Station Network No.
Relay Station No.
POINT
POINT
POINT
Routing parameter setting of request source
Routing parameter setting is also necessary for the
request source GOT.
For the setting, refer to the following.
11.3.3 Routing parameter setting
Range
1 to 239
1 to 239
1 to 120
12. CC-Link IE FIELD NETWORK CONNECTION
GT Designer3 [Communication settings] of
System configuration (Network Type: CC IE
Field)
Item
Network Type
Network No.
Station No.
Group No.
Mode Setting
Refresh Interval
Input for Error Station
Retry
Timeout Time
Delay Time
Monitor Speed
POINT
POINT
POINT
[Controller Setting] of GT Designer3
For the setting method of [Controller Setting] of GT
Designer3, refer to the following.
11.3.1 Setting communication interface
(Communication settings)
12.4 PLC Side Setting
Set value
CC IE Field
1: Network No.1
1: Station No.1
0 (fixed)
Online
25ms (Use default value)
Clear (Use default value)
3times (Use default value)
3sec (Use default value)
0ms (Use default value)
High (Normal) (Use default value)
12 - 15
9
10
11
12
13
14
15
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents