Mitsubishi Electric GT1685 Connection Manual page 820

Got1000 series
Table of Contents

Advertisement

(For bus connection)
6.
Double-click [GOT] of the PLC side I/F to display
[PLC side I/F Detailed Setting of GOT].
7.
Check-mark either of the following in [PLC side I/F
Detailed Setting of GOT].
Bus connection
[via GOT(Bus) transparent mode]
Direct CPU connection
Mark the [via GOT(direct coupled) transparent mode]
checkbox.
8.
The screen returns to [Transfer Setup Connection1].
Click [Connection Test] to check if GX Works2 has
been connected to the QCPU (Q mode).
23 - 58
23. FA TRANSPARENT FUNCTION
23.6 Personal Computer Side Setting
(2) Connecting the GOT and PLC in computer link
connection (when connecting to QJ71C24 (N))
1.
Click the Connection Destination view
[Connection Destination]
name)] in the Navigation window of GX Works2.
2.
The [Transfer Setup Connection1] is displayed.
3.
Set the [Transfer Setup Connection1]:
PC side I/F
PLC side I/F
Other Station Setting
4.
Double-click [Serial USB] of the PC side I/F to display
[PC side I/F Serial Setting].
5.
Check-mark either of the following in [PC side I/F
Serial Setting].
When connecting the GOT and PC with serial
When connecting the GOT to PC via modem
Mark the [RS-232C] checkbox.
When connecting the GOT and PC with USB
Mark the [USB] checkbox.
[(Connection target data
: Serial USB
: GOT
: No Specification

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents