Cisco AP775A - Nexus Converged Network Switch 5010 Configuration Manual page 471

Fabric manager configuration guide, release 4.x
Hide thumbs Also See for AP775A - Nexus Converged Network Switch 5010:
Table of Contents

Advertisement

Chapter 21
Configuring N Port Virtualization
Configuring NPV
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m
Figure 21-27
Error in Applying Configurations and Details
After the completion of all the tasks a link View NPV Port Connections is displayed in the place of the
progress bar. (See
Figure
21-27.)
Click View NPV Port Connections to view the NPV port connections in a table (See
Figure
21-29).
Refer to this list to verify the physical connections between NP Port on NPV devices and Auto ports) on
NPIV core switches. The physical connections already exist in case of the ISLs and they have to be
verified. In some cases when the physical connections do not exist, they have to be established manually.
Cisco MDS 9000 Family Fabric Manager Configuration Guide
21-29
OL-17256-03, Cisco MDS NX-OS Release 4.x

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents