Preparing For Setup - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
Section 3-5

Preparing for setup

3-5-1
Verify Customer Order
Compare items received by the customer to that which is listed on the delivery order. Report any items
that are missing, back ordered, or damaged.
3-5-2
Physical inspection
Verify that the LOGIQ E9 arrived intact (visual inspection).
If the LOGIQ E9 has been damaged, please refer to "Damage in Transportation "on page
beginning of this manual.
3-5-2-1
LOGIQ E9 voltage settings
See:
3-6-3-1 "Verification of the LOGIQ E9's voltage setting" on page
3-5-3
Volume Navigation Stand
To assemble the Volume Navigation Stand, See:
page 8-617
page
8-625.
. 2
EV
or
8-15-4 "On-Board V Nav Stand Option Contents, location and placement of parts" on
Chapter 3 LOGIQ E9 Setup
3-17.
8-15-2 "Assembling or replacing the Roll Stand" on
LOGIQ E9 S
M
ERVICE
ANUAL
x
in the
3 - 13

Advertisement

Table of Contents
loading

Table of Contents