GE LOGIQ E9 Service Manual page 303

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
7-5-8-8
Analog Receive (cont'd)
Tests the signal path from the GFI to the backplane (GTX) to the GRX.
Name: DC Offset Calibration Utility
NOTE:
The DC Offset Calibration Utility diagnostic MUST be run when the DRX boards are replaced
or moved. See:
Description: Measures and corrects for the DC offset of the ADCs on the DRX.
Run Time: 00:02
Run this utility to calibrate the correct DC offset after replacing or moving DRX boards. A popup
message alerts the user to run this utility after DRX boards have been replaced or moved.
Name: Analog RX Test (High Gain)
Description: Signal path test of the GRX boards with a TGC set to high (peak) gain. Failures could be
channel in DRX boards, Nathan, GRX to DRX communication.
Run Time: 00:02
If this test failed:
1.) Swap DRX boards to determine if the failure point changes as the boards are moved.
NOTE:
A block of 8 dead channels indicates a failed DRX board.
2.) Replace any failed boards.
3.) Replace GRX boards (these cannot be swapped as one is 64 channel and one is 128 channel).
Name: Analog RX Test (Medium Gain)
Description: Signal path test of the GRX boards with a TGC set to medium gain.
Run Time: 00:02
If this test failed:
1.) Swap DRX boards to determine if the failure point changes as the boards are moved.
NOTE:
A block of 8 dead channels indicates a failed DRX board.
2.) Replace any failed boards.
3.) Replace GRX boards (these cannot be swapped as one is 64 channel and one is 128 channel).
. 2
EV
Section 6-6 "DC Offset Calibration" on page
Chapter 7 Diagnostics/Troubleshooting
LOGIQ E9 S
6-20.
M
ERVICE
ANUAL
7 - 55

Advertisement

Table of Contents
loading

Table of Contents