GE LOGIQ E9 Service Manual page 391

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-5-7
Front Cover replacement
Manpower /
Time
One person /
15 minutes
Table 8-26
1. Power down the system.
2. Disconnect the mains power cable from the wall outlet and all Probes and External I/O Cabling.
3. Remove the Side Covers, Top Cover and the Foot Rest Bumper.
Preparation Links (if you need more information):
• 4-2-3 "Power shut down" on page 4-7.
• 8-5-2 "Side Covers replacement" on page 8-30.
• 8-5-4 "Top Cover replacement" on page 8-38.
• 8-5-6 "Foot Rest Bumper replacement" on page 8-43.
8-5-7-1
Front Cover removal
The Front Cover Assembly is made of two pieces.
1.. Unscrew the two Phillips screws that fix the
Front Cover Assembly to the chassis.
Pull the upper end of the Front Cover out
and upwards to free it from the pedals and
the frame.
. 2
EV
Table 8-25
Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Preparations and Preparation Links
Preparations - you must perform the following steps
Table 8-27
Front Cover Screw placement
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
Tools
Corresponding Graphic
M
ERVICE
ANUAL
8-5.
8 - 45

Advertisement

Table of Contents
loading

Table of Contents