Calibration and adjustments
Refer to:
8-6-3-5
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
4.) Move the LCD Monitor Arm from side to side and ensure that it moves as intended.
8-6-3-6
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all required checks and is ready for use.
See
Section
4-2-2
4-2-3
4-3-5
4-3-7
6-3-4
10-6-4
10-6-5
. 2
EV
Section 6-3 "LCD Monitor adjustments" on page 6-2
Table 8-71
LCD Arm assembly replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
B-Mode Checks
System CFM and PWD Checks
LCD Adjustment Procedure
Grounding continuity
Chassis leakage current test
Chapter 8 Replacement procedures
for LCD Monitor calibration instructions.
Debrief Script
LOGIQ E9 Service Manual, Direction
5535208-100, Rev. 2. Equipment passed all
required checks and is ready for use.