GE LOGIQ E9 Service Manual page 492

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-6-10-1
Lower Operator Panel (OP) removal
Table 8-97
1. Keep XY / Frogleg mechanism in a
released state and the console
extended to gain access to the
screws in the next step. The screws
are available from the underside of
the OP Panel Lower Frame.
2. Remove the five longer, and the
three shorter screws (closest to
front) that secure the Lower
Operator Panel to the Lower
Operator Panel Frame Assembly.
Access the screws from beneath
the Lower OP Panel Frame
Assembly.
3. Remove the Alphanumeric Keyboard screws (M3 x 8).
8 - 146
. 2
EV
Lower Operator Panel (OP) removal
Steps
Section 8-6 - Replacing Top Console Parts
Corresponding Graphic
Frogleg mechanism released and
console extended
Screw placement, Lower OP Panel Frame
Assembly (shown) to Lower OP Panel
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents