IRECTION
Table 8-166 4D MC Reinstallation for Cherokee/Mitra PS
5.
Connect the USB Cable from the 4D MC
to J28 on the BEP.
6.
Install the Main Power Supply.
Install the rear Cover.
Install the Side Covers.
Record VPD information for 4D Motor Controller. For information on updating VPD, see:
8-4-7-2 "Verify and Update Vital Product Data" on page
7.
Perform Functional Checks. See:
8-10-4-6 - Verification
8 - 262
. 2
EV
Steps
and
8-10-4-7 "Functional Checks" on page
Section 8-10 - Main Power Supply parts replacement
Corresponding Graphic
8-28.
8-10-4-5 - Calibration and
LOGIQ E9 S
ERVICE
adjustments,
8-268.