Verifying the software option key settings
NOTE:
Software Option Dongles are software version dependant. If a new software version has been
installed, follow installation instructions for that software. Usually, new software option strings
are needed. When reinstalling the same software, the Software Option Strings should be
reused.
1.) From the Touch Panel, select Utility -> Admin -> System Admin.
2.) Verify that the Software Option String(s) (alphanumeric strings) in the S/W Option Dongle section
is (are) the same as recorded in
3.) If needed, enter any new or missing option key string(s) in S/W Option Key field and select Add.
8-4-6-9
Verifying the TCP/IP settings
1.) From the Touch Panel, select Utilities -> Connectivity -> TCP/IP.
2.) Verify that all settings on the TCP/IP screen match those recorded in
from TCP/IP screen" on page
3.) Select "SAVE SETTINGS."
4.) Select OK to continue.
5.) Reboot system.
8-4-6-10
Verifying the AE Title and Port settings
1.) From the Touch Panel, select Utilities -> Connectivity -> Device.
2.) Verify that all settings on the Device settings screen match those recorded in
— Recording the AE Title and Port settings" on page
3.) Select "SAVE SETTINGS."
4.) Select OK to continue.
8 - 22
. 2
EV
Section 8-4 - Loading / Reloading / Upgrading the Software
Table 4-10 "Software Option Keys" on page
4-18.
4-20.
LOGIQ E9 S
M
ERVICE
ANUAL
4-26.
Table 4-2 "Record settings
4-2-11-4 "Connectivity

Advertisement

Table of Contents
loading

Table of Contents