GE LOGIQ E9 Service Manual page 383

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-5-3-1
Shear Wave Console Cover removal / installation
NOTE:
Whenever the left Side Cover is removed, clear the BEP Fan(s) intake(s) of any debris.
Table 8-9
1.
Loosening the Top Cover or removing it will
allow the Front Cover to flex enough to
slide the Shear Wave Console Cover out.
Slide the Cover out.
2.
Reinstall the replacemnt Cover.
3.
Reinstall the Top Cover, if removed and the Side Cover.
4.
If the Top Cover was removed, perform Functional Checks. See:
adjustments,
. 2
EV
Shear Wave Console Cover removal / installation
Steps
8-5-4-4 - Verification
Chapter 8 Replacement procedures
Corresponding Graphic
and
8-5-4-5 "Functional Checks" on page
LOGIQ E9 S
M
ERVICE
8-5-4-3 - Calibration and
8-40.
ANUAL
8 - 37

Advertisement

Table of Contents
loading

Table of Contents