GE LOGIQ E9 Service Manual page 483

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-6-8-1
Upper OP Panel/Touch Panel Assembly removal (cont'd)
Table 8-88
3.
Attach the cables to the Upper OP Panel/
Touch Panel Assembly before installing it
to the system.
9 - Power - ON/OFF (from BEP)
10 - USB - Upper OP Panel (from BEP)
11 - USB - Video (from BEP), if present
4.
Install the Upper OP Panel/Touch Panel
Assembly into the Frame UI Upper. Be sure
the Upper OP Bezel alignment tabs are
positioned, correctly into the slots in the
Lower OP Bezel and Frame UI Upper
Cover.
. 2
EV
Upper OP Panel/Touch Panel Assembly installation (cont'd)
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
Corresponding Graphic
Cables to Upper OP
Upper OP Panel/Touch Panel Assembly
alignment tabs and slots
M
ERVICE
ANUAL
8 - 137

Advertisement

Table of Contents
loading

Table of Contents