GE LOGIQ E9 Service Manual page 594

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
Table 8-159 Main PS installation
1.
Reconnect the Mains PS Cable and all
cables -
AC Output to Peripherals, Printer, Power to
BEP and USB on top of the Main PS.
If the Shear Wave option is installed,
reconnect the cable that supplies voltage to
the Capacitor Pack.
2.
Install the Rear Cover, Top Cover and Side Covers.
3.
Perform Functional Checks. See:
8-10-2-4 - Verification
8 - 248
. 2
EV
Steps
and
8-10-2-5 "Functional Checks" on page
Section 8-10 - Main Power Supply parts replacement
(Cherokee/Mitra) PS connectors
(Lambda) PS connectors without Shear Wave option
(Lambda) PS connectors with Shear Wave option
PCIe Cable routed between Card Cage and Targa (right side
view). GFI Configuration only. MRX does not use this cable.
8-10-2-3 - Calibration and
LOGIQ E9 S
ERVICE
Corresponding Graphic
(R4 and earlier)
(R5 and later)
adjustments,
8-249.
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents