GE LOGIQ E9 Service Manual page 575

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-9-6-2
HDD installation
Table 8-141 HDD installation
1.
Slide the HDD bracket hinges into the BEP frame slots.
2.
Connect the cables to the HDD.
3.
Swing the HDD bracket into place.
4.
Install the screw that secures the HDD bracket.
5.
Insert the base of the BEP cover at the base of the BEP.
Be sure the bottom lip of the BEP cover rests inside the BEP.
6.
Connect the Battery cable to J3 on the EPS and EPS to BEP cables to the EPS.
7.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
Be careful not to pinch any of the cables when installing the BEP cover.
8.
Tighten and secure the thumb screw(s) at the top of the BEP cover, or the three screws that
attach the cover to the BEP.
9.
Replace the side cover.
10. Power up the system.
11. Reinstall the Base Load and Application Software.
12. Enter the TCPIP settings and Option strings for the LOGIQ E9.
13. Restore the Patient Archive images, Report Archive, User-Defined Configuration (Customer
Presets), and Service settings.
14. Perform Functional Checks. See:
8-9-7-4 - Verification
. 2
EV
Steps
NOTICE
and
Chapter 8 Replacement procedures
8-9-7-3 - Calibration and
8-9-7-5 "Functional Checks" on page
LOGIQ E9 S
ERVICE
Corresponding Graphic
adjustments,
8-234.
M
ANUAL
8 - 229

Advertisement

Table of Contents
loading

Table of Contents