GE LOGIQ E9 Service Manual page 598

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-10-3-5
Main Power Supply Fan Assembly installation
Table 8-162 Installing the replacement Fan Assembly
1.
Prepare the replacement Fan Assembly
for installation.
Identify the connector for fan 1 (a). Fan 1
connector is identified with a black
marking. Fan 1 (a) is the fan on the right
side of the Fan Assembly (as shown).
If there are no tie wraps attached, attach a
tie wrap (b) to the connector cables to
position the cables in the center of Fan 2
(c). Trim the end of the tie wrap.
NOTE: The tie wraps are necessary to
position the cables between the heatsink
and the module when the Fan Assembly is
placed into the PS.
2.
Position the Fan Assembly under the PS
(as shown), to ease connecting the
connectors to the PS.
Connect the Fan Assembly connectors to
PS the fan terminals:
NOTE: Fan 1 must be connected to the
terminal labeled X14 (circled). Terminal
X14 supplies the voltage to the stand-by
fan (Fan 1) and also the regular operating
voltage to Fan 1, once the system is
turned on.
· Fan 2 or 3 to the terminals labeled X12
or X13
· Fan 1 to terminal labeled X14
8 - 252
. 2
EV
Step
Section 8-10 - Main Power Supply parts replacement
LOGIQ E9 S
Corresponding Graphic
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents