8-9-4-2
BEP I/O Board installation
Table 8-132 BEP I/O Board installation
1.
Guide the I/O Board into the BEP frame.
2.
Be sure the three tabs on the end of the I/O
fit into the three slots in the back of the BEP
frame.
You will need to press in on the right side of
the I/O cover while pulling out on the left
side of the cover.
You may need to seat the lower tab first
and work up to the top
2.
Loosely insert all five screws before tightening them.
3.
Re-install the cables in the reverse order from when they were removed, following the markings
and re-install the Option Dongle.
4.
Re-install the HDD.
5.
Reconnect the I/O cabling.
6.
Connect the Battery cable to J3 on the EPS.
7.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
Be careful not to pinch any of the cables when installing the BEP cover.
8.
Tighten and secure the thumb screw(s) at the top of the BEP cover that attach the cover to the
BEP.
9.
Replace the side cover.
10. Perform Functional Checks. See:
8-9-5-4 - Verification
8 - 220
. 2
EV
Steps
NOTICE
and
Section 8-9 - BEP (Back End Processor) parts replacement
8-9-5-3 - Calibration and
8-9-5-5 "Functional Checks" on page
LOGIQ E9 S
ERVICE
Corresponding Graphic
adjustments,
8-225.
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents