GE LOGIQ E9 Service Manual page 320

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
7-5-8-13
bayBIRD Tests (cont'd)
Sensor 4 added for DriveBay2+ 3D Tracking System, introduced in R4.
Name: Run All Tests
Description: Runs all of the tests that are in the box
Run Time: 00:24
If this test failed:
1.) Run subsequent tests as identified in the failed test results
Name: Sensor 1
Description: Runs the tests for Sensor 1
Run Time: 00:21
If this test failed:
1.) Move the sensor (trandsucer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
Name: Sensor 2
Description: Runs the tests for Sensor 2
Run Time: 00:21
If this test failed:
1.) Move the sensor (transducer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
Name: Sensor 3
Description: Runs the tests for Sensor 3
Run Time: 00:21
If this test failed:
1.) Move the sensor (transducer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
Name: Sensor 4 (R4 and bayBird2+)
Description: Runs the tests for Sensor 4
Run Time: 00:21
If this test failed:
1.) Move the sensor (transducer) to a different port. If the transducer fails, replace the transducer.
2.) If the problem still persists, replace the bayBIRD.
7 - 72
. 2
EV
Section 7-5 - Common Service Desktop
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents