GE LOGIQ E9 Service Manual page 552

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
Table 8-123 BEP installation - R3.x and earlier
10. Replace the Printer Tray at the top of the BEP.
Be sure the lip, on the underside of the bracket, hooks on the edge of the card rack, and the three
tabs insert into the slots on the top of the BEP frame. The lip "clamps" the card rack and BEP
together. This is a tight fit.
11. Lower the lower Column Cover. Make sure the Column Cover is behind the Printer Tray.
12. Position the Front Cover to engage the Column Cover stop tabs.
13. Latch the two latches that clamp the Printer Tray to the top of the BEP.
14. Slide the Black and White printer into the
Printer Tray and connect the cables to the
back of the printer.
15. Tighten the Printer Tray wing nut to secure the printer.
16. Connect all cables at the top of the BEP and all I/O cables.
17. Replace the covers.
18. Reinstall Base Load and Application software.
19. Enter the system's TCPIP settings and Option strings.
20. Restore the Patient Archive images, Report Archive, User-Defined Configuration (Customer
Presets), and Service settings.
21. Perform Functional Checks. See:
and
8 - 206
. 2
EV
Steps
8-9-3-5 "Functional Checks" on page
Section 8-9 - BEP (Back End Processor) parts replacement
Corresponding Graphic
8-9-3-3 - Calibration and
8-216.
LOGIQ E9 S
ERVICE
adjustments,
8-9-3-4 - Verification
M
ANUAL

Advertisement

Table of Contents
loading

Table of Contents