GE LOGIQ E9 Service Manual page 316

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
7-5-8-11
Tx Power Supply Test (cont'd)
Name: TxPs Control Test
Description: Transmit Power Supply Control Test (Verifies the voltage points are within specifications)
Run Time: 00:10
If this test failed:
1.) Replace the power supply
Name: TxPs Watchdog Test
Description: Transmit Power Supply GFI Watchdog Test (Tests that the power supply watchdog is
working)
Run Time: 00:07
If this test failed:
1.) Replace the power supply
Name: TxPs Alarm Test
Description: Transmit Power Supply Alarm Test (Tests the fault detection of power supply)
Run Time: 00:04
If this test failed:
1.) Replace the power supply
Name: TxPs Keep Alive Test
Description: Transmit Power Supply Keep Alive Test (Tests the communication between BEP and
power supply and fault detection)
Run Time: 00:07
If this test failed:
1.) Replace the power supply
7 - 68
. 2
EV
Section 7-5 - Common Service Desktop
LOGIQ E9 S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents