GE LOGIQ E9 Service Manual page 633

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-11-8-2
Printer Bracket installation
Table 8-180 Printer Bracket installation
1.
Cut the tie wrap that secures the Drive Gear Assembly power cable to the top of the Targa.
Remove the Cable Tie Mount from the top of the Targa Frame.
2.
Remove the two T30 torx screws that
secure the Z-Mechanism to the Targa.
3.
Route the Printer Cables as shown. Route
the Power Cable as shown and the USB
Cable on top of the Targa, along the inside
edge of the Rear Handle. Continue to route
the USB Cable inside the Targa to J26 on
the BEP.
4.
Reinstall the Rear, but DO NOT install the screws.
MAKE SURE the Printer USB and Power Cables DO NOT get pinched.
. 2
EV
Steps
Chapter 8 Replacement procedures
LOGIQ E9 S
ERVICE
Corresponding Graphic
M
ANUAL
8 - 287

Advertisement

Table of Contents
loading

Table of Contents