GE LOGIQ E9 Service Manual page 407

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-5-13
Cable Hook replacement
8-5-13-1
Manpower
One person, 15 minutes.
8-5-13-2
Tools
For tools needed, refer to:
8-5-13-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Remove the Side Covers.
4.) Remove the Rear Cover.
Follow these links if you need more information:
4-2-3 "Power shut down" on page 4-7.
8-5-2 "Side Covers replacement" on page 8-30.
8-5-11 "Rear Cover replacement" on page 8-54.
8-5-13-4
Cable Hook removal
1.) Locate the Cable Hook(s).
2.) Place the Rear Cover face down on a protected, flat surface.
3.) Remove the screw securing the Cable Hook.
4.) Repeat step 2 to remove the other Cable Hook, if necessary.
. 2
EV
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Figure 8-25 Cable Hooks
Chapter 8 Replacement procedures
LOGIQ E9 S
M
ERVICE
ANUAL
8-5.
8 - 61

Advertisement

Table of Contents
loading

Table of Contents