GE LOGIQ E9 Service Manual page 585

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

GE
D
5535208-100, R
IRECTION
8-9-9
BEP Battery Pack replacement - R4.x and later
Manpower /
Time
One person /
15 minutes
Table 8-152 Preparations and Preparation Links
RISK OF ELECTRICAL SHOCK, SYSTEM MUST BE TURNED OFF. AVOID ALL
WARNING
WARNING
CONTACT WITH ELECTRICAL CONTACTS, CONDUCTORS AND COMPONENTS.
ALWAYS USE NON-CONDUCTIVE HANDLES DESIGNED FOR THE REMOVAL AND
REPLACEMENT OF ESD SENSITIVE PARTS. ALL PARTS THAT HAVE THE
POTENTIAL FOR STORING ENERGY MUST BE DISCHARGED OR ISOLATED
BEFORE MAKING CONTACT.
IF THE SHEAR WAVE OPTION IS PRESENT, MAKE SURE THE LEDS ON THE
CAPACITOR PACK ARE OFF BEFORE DISCONNECTING THE CAPACITOR PACK
CABLES.
DO NOT TOUCH ANY BOARDS WITH INTEGRATED CIRCUITS PRIOR TO TAKING
WARNING
WARNING
THE NECESSARY ESD PRECAUTIONS.
1. ALWAYS CONNECT YOURSELF, VIA AN ARM-WRIST STRAP, TO THE ADVISED
ESD CONNECTION POINT LOCATED ON THE REAR OF THE SCANNER (NEAR THE
POWER CONNECTOR).
2. FOLLOW GENERAL GUIDELINES FOR HANDLING OF ELECTROSTATIC
SENSITIVE EQUIPMENT.
THE WASTE OF ELECTRICAL AND ELECTRONIC EQUIPMENT MUST NOT BE
WARNING
WARNING
DISPOSED AS UNSORTED MUNICIPAL WASTE AND MUST BE COLLECTED
SEPARATELY.
CONTACT THE MANUFACTURER OR OTHER AUTHORIZED DISPOSAL COMPANY
TO DECOMMISSION YOUR EQUIPMENT.
. 2
EV
Table 8-151 Manpower / Time and Tools
Refer to:
8-2-5 "Tools needed for servicing the LOGIQ E9" on page
Preparations - you must perform the following steps
Chapter 8 Replacement procedures
LOGIQ E9 S
Tools
M
ERVICE
ANUAL
8-5.
8 - 239

Advertisement

Table of Contents
loading

Table of Contents