Suzuki Ignis Service Manual page 424

Rg413
Table of Contents

Advertisement

6-50 ENGINE GENERAL INFORMATION AND DIAGNOSIS
INSPECTION
Step
1
Main Relay Operating Sound Check
Is operating sound of main relay heard at ignition switch
ON?
2
Main Relay Check
1) Turn OFF ignition switch and remove main relay (1).
2) Check for proper connection to main relay (1).
3) Check resistance between each two terminals. See Fig.
1 and 2.
Between terminals C and D : Infinity
Between terminals A and B : 56 – 146 Ω
4) Check that there is continuity between terminals C and
D when battery is connected to terminals A and B. See
Fig. 3.
Is main relay in good condition?
3
Fuse Check
Is main fuse in good condition? See Fig. 4.
4
ECM Power Circuit Check
1) Turn OFF ignition switch, disconnect connectors from
ECM and install main relay.
2) Check for proper connection to ECM at terminals G02-6
(Case of TYPE A. See NOTE) or C41-11 (Case of TYPE
B. See NOTE), C41-10, C41-5 and C41-6.
3) If OK, then measure voltage between terminal G02-6
(Case of TYPE A. See NOTE) or C41-11 (Case of TYPE
B. See NOTE) and ground, C41-10 and ground with igni-
tion switch ON.
Is each voltage 10 – 14 V?
5
ECM Power Circuit Check
1) Using service wire, ground terminal C41-10 and mea-
sure voltage between terminal C41-5 and ground at igni-
tion switch ON.
Is it 10 – 14 V?
6
Is operating sound of main relay heard in Step 1?
7
Main relay check
1) Check main relay according to procedure in Step 2.
Is main relay in good condition?
Action
Yes
Go to Step 5.
Go to Step 2.
Go to Step 3.
Replace main relay.
Go to Step 4.
Check for short in
circuits connected
to this fuse.
Go to Step 5.
"BLK/WHT", "BLK/
YEL" or "BRN/
WHT" circuit open.
Check ground cir-
Go to Step 6.
cuits "BRN/WHT"
and "BLK/YEL" for
open.
If OK, then substi-
tute a known-good
ECM and recheck.
Go to Step 7.
"BLK/YEL" or "BLK/
RED" wire open.
"BLK/YEL" or "BLK/
Replace main relay.
RED" wire open.
No

Advertisement

Table of Contents
loading

Table of Contents