Suzuki Ignis Service Manual page 652

Rg413
Table of Contents

Advertisement

6E1-26 ENGINE AND EMISSION CONTROL SYSTEM
5, (a)
2
3
4
1
INSTALLATION
For installation, reverse removal procedure and note following
precautions.
• Replace injector O-ring (1) with new one using care not to
damage it.
• Check if cushion (2) is scored or damaged. If it is, replace
with new one.
• Apply thin coat of fuel to O-rings (1) and then install injectors
(3) into delivery pipe (4) and intake manifold.
Make sure that injectors (3) rotate smoothly (6). If not, proba-
ble cause is incorrect installation of O-ring (1). Replace O-
ring (1) with new one.
• Tighten delivery pipe bolts (5) and make sure that injectors
(3) rotate smoothly (6).
Tightening torque
Delivery pipe bolts (a) : 28 N·m (2.8 kg-m, 20.5 lb-ft)
• After installation, with engine "OFF" and ignition switch "ON",
check for fuel leaks around fuel line connection.

Advertisement

Table of Contents
loading

Table of Contents