A/C Switch; Compressor; Radiator/Condenser Cooling Fan Motor Relay No.1, No.2 And - Suzuki Ignis Service Manual

Rg413
Table of Contents

Advertisement

1B-36 AIR CONDITIONING (OPTIONAL)

A/C SWITCH

REMOVAL AND INSTALLATION
Refer to "HEATER CONTROL ASSEMBLY" in Section 1A.
INSPECTION
• Press A/C switch button and check if there is continuity
between terminals "A" and "B".
• Connect battery voltage (+) to terminal "C" and (–) to termi-
nal "A", and then press A/C Switch button and check if indi-
cator lamp lights.
RADIATOR/CONDENSER COOLING FAN
MOTOR RELAY No.1, No.2 and No.3
INSPECTION
Refer to "RADIATOR FAN RELAY" in Section 6B.

COMPRESSOR

REMOVAL
1) Run engine at idle speed with air conditioning ON for 10 min-
utes. After that stop the engine.
2) Disconnect negative (–) cable at battery.
3) Recover refrigerant from refrigeration system by referring to
"RECOVERY" in this section.
NOTE:
The amount of removed compressor oil must be mea-
sured for replenishing compressor oil.
4) Remove front bumper by referring to "FRONT BUMPER" in
Section 8.
5) Remove engine food cover (1) from vehicle body.

Advertisement

Table of Contents
loading

Table of Contents