Mitsubishi Electric GOT2000 Series User Manual page 541

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

Step 4.
Start the CNC monitor.
The CNC monitor screen is displayed after the channel number is selected.
■1. Start operation using the special function switch
The CNC monitor can be launched using special function switches.
If a special function switch with the following settings is touched, the CNC monitor screen of the set controller can be
displayed.
• Select [CNC Monitor] in [Switch Action] and select [Specify the destination to connect the screen of CNC Monitor].
For Q buss connection, input 2 or larger for [CPU No.] in [Network].
Operation at start differs depending on the setting contents of the special function switch.
For the setting items for the special function switch, refer to the following.
GT Designer3 (GOT2000) Screen Design Manual
■2. Changing screens
At next startup, the last exited screen is displayed.
However, the last exited screen will not be displayed when the GOT is restarted after package data is written or the
GOT is powered on, off, or reset.
Start
At the second or
Utility
later startup
user-created monitor screen
RET
When exiting the CNC monitor function by touching RET ,
the last exited screen will be displayed when the CNC monitor
function is started next time.
or
At the first startup
Communication
setting window
RET
RET
17.3 Operations for Display
17
17 - 5

Advertisement

Table of Contents
loading

Table of Contents