Specifications; System Configuration - Mitsubishi Electric GOT2000 Series User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

5.2

Specifications

5.2.1

System configuration

This section describes the system configuration for the sequence program monitor (SFC).
For connection type settings and precautions regarding the communication unit/cable and connection type, refer to the
following.
■1. Target controller
*1
QCPU (Q mode)
LCPU
*1
■2. Connection type
This function can be used in the following connection types.
(○: Available, ×: Unavailable)
Function
Name
Description
Sequence
Monitors
program
SFC
monitor
programs.
(SFC)
*1
*2
*3
*4
*5
*6
*7
*8
*9
■3. Required system application (extended function)
For the system application (extended function) required, refer to the following.
(1) System application (extended function)
Write the package data that contains the system application (extended function) for the sequence program monitor
(SFC) to the GOT.
For the communication method with the GOT, refer to the following.
(2) System application (extended function) size
To install a system application (extended function) to the GOT, enough space in the user area is required.
For information on how to check the available space of the user area and each data size, refer to the following.
■4. Required hardware
The following hardware is required.
Data storage (Such as an SD card and USB memory)
5 - 4
5.2 Specifications
GOT2000 Series Connection Manual (Mitsubishi Products) For GT Works3 Version1
Controller
For creating a multiple CPU system with the Q00CPU, Q01CPU, Q02CPU, Q02HCPU, Q06HCPU, Q12HCPU, and/or
Q25HCPU, use CPUs with the function version B or later.
Bus
Direct CPU
*8
connection
connection
*6*7
For the MELSECNET/10 connection, use a QCPU and network module (QJ71LP21, QJ71LP21-25, QJ71LP21S-25, and
QJ71BR11) with the function version B or later.
Indicates the CC-Link IE Controller Network connection.
Indicates CC-Link IE Field Network connection.
Indicates CC-Link connection (Intelligent device station).
Indicates CC-Link connection (via G4).
The Q12PRHCPU and Q25PRHCPU are not available.
Sequence program monitor (SFC) cannot be used when using CC-Link IE field network Ethernet adapter.
The LCPU does not support the connection type.
When the GOT is connected to LCPU, use L6ADP-R2.
1.2 System Applications (Extended Functions) Required for Each Function
GT Designer3 (GOT2000) Screen Design Manual
GT Designer3 (GOT2000) Screen Design Manual
Hardware
Connection type between GOT and controller
Serial
Ethernet
communication
*9
connection
connection
CC-Link IE
MELSECNET/H
controller
*8
connection
,
connection
*7
MELSECNET/10
CC-Link IE field
*1*8
connection
connection
CC-Link
connection
*2*8
,
*4
*4*5
ID
G4
*3

Advertisement

Table of Contents
loading

Table of Contents