Operation For Display - Mitsubishi Electric GOT2000 Series User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

13.3 Operation for Display

This section describes the operation procedure from turning on the power to the GOT to ladder monitor function display.
■1. Start operation for the FX ladder monitor
(1) Normal operation
This subsection describes the flow until the FX ladder monitor operation screen is displayed after an FX ladder
monitor is installed in the GOT.
Starting from
the utility
*1
Display the utility.
After the utility is displayed,
touch [Monitor] → [FX Ladder monitor]
from the Main Menu.
Read the PLC and display the
sequence program.
*3
*1
For how to display the utility, refer to the following.
*2
For how to set special function switches, refer to the following.
*3
For the details, refer to the following.
Turn on the power to the GOT.
GOT2000 Series User's Manual (Utility)
GT Designer3 (GOT2000) Screen Design Manual
13.3 Operation for Display
POINT
POINT
POINT
(1) How to display the utility
For how to display the utility, refer to the following.
GOT2000 Series User's Manual (Utility)
(2) If the project data has not been downloaded
The FX ladder monitor can be started from the utility even if the project data has not been
downloaded to the GOT.
Start
Starting from the special
function switch (ladder monitor)
set in the project data
Touch the special function switch.
End
13.3 Operation for Display
*2
13
13 - 5

Advertisement

Table of Contents
loading

Table of Contents