Mitsubishi Electric GOT2000 Series User Manual page 200

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

(1) Starting the function by using the special function switch (System launcher)
You can start the network monitor from a user-created screen by selecting the connection destination with a special
function switch to which [System Launcher] is set.
User-created screen having
a special function switch
(System Launcher) placed
Start the system launcher.
6 - 12
6.3 Operations for display
System configuration screen
[×] key
POINT
POINT
POINT
When the system launcher does not support the connection destination
When the system launcher does not support the set connection destination, a dialog appears at
the startup.
For the details of the system launcher function, refer to the following.
2. SYSTEM LAUNCHER
Select the target function.
[End] key
The network monitor is started.

Advertisement

Table of Contents
loading

Table of Contents