18.3 Operations for Display
■1. Start operation of the CNC data I/O
The following explains how to display the CNC data I/O screen after the GOT is turned on.
Step 1.
Turn on the power to the GOT.
Step 2.
Display the CNC data I/O screen.
Use either of the following display methods.
• Starting from the special function switch (CNC data I/O) set in the project
For how to set special function switches, refer to the following.
➠
• Starting from the utility
After the utility is displayed, touch [Monitor] → [CNC data I/O] from the Main Menu.
For how to display the utility, refer to the following.
➠
Step 3.
Set the channel number.
Set the channel number of the CNC connected to the GOT.
If [×] is touched to close the communication setting window without setting a channel number, the channel
number is set to [1].
After the GOT is powered on, the communication setting window is displayed only at the first startup of the
CNC data I/O.
For displaying the communication setting window at the second or later startup, touch the [Ch:] key on the
CNC data I/O screen.
➠