Operations For Display - Mitsubishi Electric GOT2000 Series User Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

6.3

Operations for display

This section explains how to display the network monitor screen after the GOT is turned on.
Step 1.
Turn on the power to the GOT.
Step 2.
Display the network monitor screen by one of the following methods.
• Starting from the special function switch (Network monitor) set in the project data
For information on how to set special function switches, refer to the following
• Starting from the utility
In the utility, touch [Monitor] → [Network monitor] from the Main Menu.
For information on how to display the utility, refer to the following.
Step 3.
Set the channel number.
Set the channel number of thecontroller targeted to the network.
After the GOT is turned on, the communication setting window is displayed automatically only at the first
startup of the network monitor.
To display the communication setting window after the first startup, touch the [Ch:] key on the network
monitor screen.
Step 4.
The network monitor startup.
The network monitor starts after a channel number is selected.
6 - 10
6.3 Operations for display
GT Designer3 (GOT2000) Screen Design Manual
GOT2000 Series User's Manual (Utility)
6.4 Operation Procedures
Communication setting window

Advertisement

Table of Contents
loading

Table of Contents