Leakage Test Diagrams - GE T2100-ST1 Service Manual

Hide thumbs Also See for T2100-ST1:
Table of Contents

Advertisement

Earth/Chassis Leakage Current to Ground
1.
2.
3.
4.
5.
6.
Ground Continuity
1.
WARNING:

Leakage Test Diagrams

These diagrams show only a representation of how a typical
leakage current tester functions. Follow the instructions
provided with the leakage current tester that you use.
Test #1
Ground-Wire-Leakage-to Ground
Make sure the UUT power switch is in the ON state without
running belt running.
Test #2
Chassis-Leakage-to-Ground (Exposed Chassis)
Make sure the UUT is in the ON state with running belt running at
2.0mph.
2097937-002 Rev G
11 March 2019
Forward Polarity (L1, L2)
Neutral (L2) open,
Forward Neutral Polarity
Ground open, Forward Polarity
Ground open, Reverse Polarity
Neutral (L2) open,
Reverse Polarity
Reverse Polarity (L2, L1)
AC mains power cord ground
prong to exposed metal surface
(ground lug)
Total system leakage current must not exceed 500
microamperes.
T2100-ST1 Treadmill, 110V / T2100-ST2 Treadmill, 220V
Assembly and Setup
NC
_________μA
Pass/Fail
SFC
_________μA
Pass/Fail
SFC
_________μA
Pass/Fail
SFC
_________μA
Pass/Fail
SFC
_________μA
Pass/Fail
NC
_________μA
Pass/Fail
N/A
Pass/Fail
________mΩ
limits
500μA
500μA
500μA
500μA
500μA
500μA
Resistance
100mΩ
41

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T2100-st2

Table of Contents