Conducting Leakage Tests - GE T2100-ST1 Service Manual

Hide thumbs Also See for T2100-ST1:
Table of Contents

Advertisement

Assembly and Setup

Conducting Leakage Tests

The leakage tests are safety tests to ensure that the equipment
poses no electrical health hazards. Use the table below to
determine which tests apply to the unit under test and the
maximum allowable leakage currents. For international leakage
limits, refer to the internal standards agencies of that particular
country.
If the unit under test fails the leakage tests, do not allow the
customer to use the equipment. Call Tech Support for assistance.
GE Healthcare recommends that you perform these tests:
NOTE:
40
If the measurements are significantly out of range, check
for breaks in the power cord or in the internal connections
within the units.
Before applying power for the first time
Whenever internal assemblies are serviced
The accuracy of the leakage tests depends on a properly-
wired wall outlet. Do not proceed until you verify the
integrity of the power source.
T2100-ST1 Treadmill, 110V / T2100-ST2 Treadmill, 220V
2097937-002 Rev G
11 March 2019

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T2100-st2

Table of Contents