Mitsubishi Electric FR-A800 Series Instruction Manual page 115

Hide thumbs Also See for FR-A800 Series:
Table of Contents

Advertisement

LED name
RUN
Operating status
SD
Transmission status
RD
Reception status
D LINK
Cyclic communication status
ERR
Node failure status
L.ERR
Link error
*1
Also lit in no-communication state.
*2
This LED indicates a communication break between the master station and the inverter (due to cable disconnection or breakage, power-OFF of
the master power supply, or reset, etc.).
114
2. INSTALLATION AND WIRING
2.11 Wiring for use of the CC-Link IE Field Network (FR-A800-GF)
Downloaded from
ManualsNet.com
Description
*2
search engine
ON
Normal operation (normal 5 V internal
*1
voltage)
Data transmitting
Data receiving
Cyclic transmitting
Node failure
Received data error
OFF
Hardware failure
No data transmitting
No data receiving
No cyclic transmitting or disconnected
Normal operation
Received data normal

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents