FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
----End

7.9 Installing Monitoring Components on Cable Troughs

7.9.1 Installing a Smart ETH Gateway

Prerequisites
Context
Table 7-4 Scenario 1
Scenario
Figure 7-57 Layout of smart ETH gateways in scenario 1
Table 7-5 Scenario 2
Scenario
Issue 04 (2017-06-30)
You have prepared a smart ETH gateway and installation accessories such as the guide
rail (delivered with the smart ETH gateway) and screws.
The number of smart ETH gateways to be installed and their installation positions have
been specified.
Components marked in the same background color should be connected to the same smart ETH
gateway.
No rack environment unit deployed
Module length ≤ 7 m; number of air
conditioners ≤ 4
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7 Installing Monitoring Devices
Rules for Deploying Smart ETH
Gateways
Deploy two smart ETH gateways for each
end cabinet in the smart module, not for
other cabinets. A total of four smart ETH
gateways should be deployed, as shown in
Figure 7-57.
Rules for Deploying Smart ETH
Gateways