FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Figure 7-6 Placing the VCN500
Step 3 Tighten the captive screws in the ears using a Phillips screwdriver, and close the mounting ear
buttons.
Figure 7-7 Installing the VCN500
Step 4 Connect the VCN500 power cable to the PDU2000.
----End
7.4 (Optional) Installing a LAN Switch
Procedure
Step 1 Determine the mounting holes for the LAN switch based on the network cabinet device layout,
adjust the guide rails, and install floating nuts.