Table Of Contents - Huawei FusionModule2000 Installation Manual

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
About This Document ............................................................................................................ ii
1 Installation Preparations....................................................................................................... 1
1.1 Precautions for Transportation ............................................................................................................................................. 1
1.2 Unpacking and Acceptance .................................................................................................................................................. 2
1.3 Installation Environment Requirements .............................................................................................................................. 3
1.4 Site Requirements ................................................................................................................................................................. 5
1.5 Documents ............................................................................................................................................................................. 6
1.6 Tools and Instruments ........................................................................................................................................................... 8
1.7 Tools Delivered with Equipment ....................................................................................................................................... 12
1.8 Personnel Requirements ..................................................................................................................................................... 14
1.9 Installation Process ............................................................................................................................................................. 15
2 Scenario Description ........................................................................................................... 16
3 Hardware Installation Preparations................................................................................... 18
3.1 Preparing for Installing Air Conditioners .......................................................................................................................... 18
3.1.1 Material Preparations....................................................................................................................................................... 18
3.1.2 Preparing for Installing the NetCol5000-A 35 kW Air Conditioner ............................................................................ 18
3.1.2.1 (Optional) Refrigerant R410A ..................................................................................................................................... 18
3.1.2.2 Refrigerant Oil .............................................................................................................................................................. 20
3.1.2.3 Pipe Components .......................................................................................................................................................... 20
3.1.2.4 Humidifier Water Inlet Pipe, Pump Drainpipe, and Automatic Drainpipe ............................................................... 21
3.1.2.5 Pipe Support .................................................................................................................................................................. 23
3.1.2.6 Preparing Cables ........................................................................................................................................................... 23
3.1.2.7 Checking the Air Pressure ............................................................................................................................................ 24
3.1.2.8 Removing the Transport Fasteners from Floats .......................................................................................................... 26
3.1.2.9 Removing the Transport Fasteners from a Compressor ............................................................................................. 28
3.1.3 Preparing for Installing the NetCol5000-A 25 kW Air Conditioner ............................................................................ 29
3.1.3.1 (Optional) Refrigerant R410A ..................................................................................................................................... 29
3.1.3.2 (Optional) Refrigerant Oil ............................................................................................................................................ 31
3.1.3.3 (Optional) Oil Trap and Inverted Trap ........................................................................................................................ 31
3.1.3.4 Humidifier Water Inlet Pipe ......................................................................................................................................... 32
3.1.3.5 Drainpipe ....................................................................................................................................................................... 33
3.1.3.6 Pipe Support .................................................................................................................................................................. 34
Issue 04 (2017-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Contents
Contents
iv

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents