Follow-up Procedure
After the ESS is installed, verify the installation to ensure normal use of products
and smooth subsequent installation.
Table 5-3 Verifying the installation
No.
1
2

5.4 Installing Components

● Ensure that the ESS is not powered on.
● The installation personnel have taken safety protection measures, for example,

5.4.1 Installing Copper Bars Between Battery Packs

Prerequisites
The battery cabin door is open.
Procedure
Step 1 Take out the copper bars from the battery cabin.
Issue 15 (2023-11-01)
Check Item
Bolts and nuts
Check whether the doors of
the ESS can be opened and
closed properly.
NO TE
If the doors of the ESS cannot be opened and closed properly, please refer to the first
question in chapter 11,
Closed'.
CA UTION
wearing insulated gloves and shoes.
Copyright © Huawei Technologies Co., Ltd.
Check Method
Tighten the bolts
and nuts again
using a wrench
with the same
torque.
Open and close
the doors of the
ESS.
'How do I Level the ESS When Doors Cannot Be Opened or
5 Installation
Criteria
Bolts and nuts are
tightened.
All doors of the
ESS can be
opened and
closed properly.