FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Do not remove the anchor bolts. Otherwise, rework is required if the cabinet height does
not meet requirements.
Anchor bolt adjustment method: Wrench an anchor bolt clockwise to elevate a cabinet leg,
or wrench an anchor bolt anticlockwise to lower it. The anchor bolts can be adjusted
within a range of 0–8 mm.
Put a level at the bottom of the cabinet in width and depth directions and check that the air
bubble is in the middle between the two lines marked on the glass tube.
Figure 4-1 Leveling a cabinet
(1) Level
Step 3 Interconnect adjacent cabinets.
1.
2.
3.
Issue 04 (2017-06-30)
Remove the M5x10 tapping screws that secure the connecting kits and then remove the
connecting kits.
Remove M4x10 screw assemblies from the position for combining cabinets.
Secure the connecting kits using the M4x10 screw assemblies.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4 Installing Cabinets