2.
Step 8 Adjust the positions of the door box fasteners.
After the door box gap is adjusted, the door box is lifted, and its fasteners may not be able to
touch the cabinet top. You need to adjust the positions of the door box fasteners to secure the
door box to the cabinet top.
1.
2.
3.
Step 9 Secure the door box to the cabinet using six M5 screws, as shown by (4) in Figure 5-28.
Issue 04 (2017-06-30)
Figure 5-27 shows a tilted door box. Turn the M6 door box screw in the leveling corner
piece nearest to the door frame clockwise to lift the door box until the Λ-shaped gap
disappears, as shown by (1) in Figure 5-28.
Figure 5-27 Λ-shaped gap
Figure 5-28 Adjusting the Λ-shaped gap
Loosen the two screws on a door box fastener but do not remove them, as shown by (2)
in Figure 5-28.
Lower the fastener until it touches the cabinet, as shown by (3) in Figure 5-28.
Tighten the screws to secure the fastener.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Installing the Contained Aisles
109

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents