Commissioning The Cooling System; Commissioning The Management System - Huawei FusionModule2000 Installation Manual

Smart modular data center, 2000 mm high cabinets, single-row aisle containment, 380 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Single-Row
Aisle Containment, 380 V)
Device Name
Precision PDC

12.3 Commissioning the Cooling System

For details about how to commission a certain component of the cooling system, see the
manual delivered with the component.
Table 12-2 References
Device Name
NetCol5000-A 25 kW air
cooled in-row precision
air conditioner
NetCol5000-A 35 kW air
cooled in-row precision
air conditioner
NetCol500 outdoor unit

12.4 Commissioning the Management System

For details about how to commission devices in the management system, see the following
documents.
Table 12-3
Document
Issue 04 (2017-06-30)
If the smart module is located in a humid environment and condensation appears on the
outside of the doors of the cold aisle containment, adjust the temperature at the air exhaust
vent of the air conditioner or dehumidify the room.
Set the initial temperature to 20º C and relative humidity to 50% for air conditioners. To
adjust the temperature for air conditioners, follow instructions provided in the documents
delivered with the air conditioners.
You are advised to enable the teamwork control function of the air conditioner in a smart
module.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
References
PDU8000 Modular Precision PDC Quick Guide (1100 mm
Deep)
References
NetCol5000-A 25 kW Air Cooled In-row Precision Air
Conditioner Quick Guide (300 mm Wide)
NetCol5000-A 25 kW&35 kW Air Cooled In-row Precision Air
Conditioner Quick Guide (600 mm Wide)
NetCol500 Variable Speed Outdoor Unit User Manual
Obtaining Method
12 Power-On Commissioning
205

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents